Construction Process

The Building Stage Can Now Begin

The whole process from start to finish is carefully planned and executed to perfection, this ensures that each and every loft conversion is carried out with as little disruption as possible. Our process is detailed below for you to see how we will complete your new conversion step by step.

All work carried out as per the approved set of plans and calculation

1. Scaffolding

Will be erected on any elevation that it is required to enable safe and efficient working throughout your project.


2. Waste Removal

A Skip will be sited and any relevant permits applied for.


3. Access

An entrance way to your loft space will be installed (normally to the front elevation). All materials and access to your loft will be through this route until the stairs are fitted in the final stages of your project. This minimizes the impact of the works to you whilst your project is under construction.


4. Clearing your loft

It is assumed that you will have cleared your loft space ready for your project to be carried out.


5. Concrete Bearings (If applicable)

Will be installed in the correct position for bearing of the steel beams.


6. Temporary Plumbing (If applicable)

Plumbing will be temporarily altered ready for the work to take place.


7. Steel Beams

Steel beam work will be installed as necessary and in accordance with the approved plans and calculations.


8. Stair Design

The design and construction of your stair case will be started now. Our staircases are purpose made from top quality materials. They are always designed to match in with the existing to look like a continuation of the existing and not an add-on. You will also get an opportunity to approve the stairs prior to them being manufactured.


9. Floor Joists

Softwood floor joists will be installed. These are normally at 400mm centre’s and bear from steel beams / previously determined load bearing walls. The floor joists will be put in position for your new staircase at this stage also. Floor joists are dropped in between ceiling joists where possible, to maximize headroom. The floor insulation will be installed at this point.


10. Floor covering

The floor will now be laid in accordance with the approved set of plans and calculations. This is normally a tongue and grooved flooring grade chipboard. However there are many variable options with the flooring material that can be priced for if required.


11. Dormer (If applicable)

The construction of the dormer will now be completed there are two types of dormer.

  • a. Flat roof dormer.
  • b. Pitched roof dormer.

12. Gable (If applicable)

The construction of the gable will now be completed.


13. Roof Structure (If applicable)

Alteration of the roof structure will now be completed.


14. Windows

The fitting of windows will now be completed.

  • a. Velux roof windows are fitted to the roof slopes.
  • b. PVC Windows for low maintenance are normally fitted to the dormers/gable walls.

15. Roof Coverings (If applicable)

The roof covering to your roof will now be installed.

  • a. Existing Roof. It is assumed that the existing roof tiles/slates are to remain where possible. We will advise you of any defects with your existing roof, fascia and gutters at the time of works if any are found. The cost of remedying will be separate to the main contract and agreed at the time of works.
  • b. New Work. Any new work i.e. dormers and gables will have new breathable felt, battens, valleys and tiles / slates to match existing as closely as possible. Flat roof dormers will be covered with 1 layer of Marley Deck (Roof cover meets the highest standard available backed by a British board of agreement certificate No. 86/1758 and carries a 20 year + life expectancy).
  • c. Overhaul. An option for an overhaul of your existing roof can be taken (if appropriate).
  • d. Re-roof. An option for a complete re-roof can be taken if you require complete peace of mind for many years to come.

16. Insulation

The insulation will now be installed as necessary and in accordance with the approved set of plans and calculations.


17. Stair Fitting

The stairs are now fitted allowing you to access your new floor.


18. Internal Walls

  • Internal walls will be installed now.
    • a. Bedroom walls.
    • b. Shower/Bathroom walls.
    • c. Hallway walls.
    • d. Party wall.
    • d. Under eaves access.
  • As a standard item if there is a space that is usable under the eaves a door will be installed for storage. Flooring is laid directly in front of the door as this is usually the most practical space for storage. Other options are available on request either before works commence or at the time of works when the space can be seen by you. You will also get an opportunity to approve the rooms as they are being constructed as we appreciate it can sometimes be hard to visualize room sizes from a plan.

19. 1st Fix Plumbing

First fix pipe work is installed now to the pre-approved positions.

  • a. Existing Boiler. It is assumed that the plumbing will run off of your existing central heating/services.
  • b. New Boiler. The option of upgrading your central heating/services can be explored prior to the work commencing or at time of works if found necessary. Pipe work will be run to shower/bathroom and radiators if these are included in your project.

20. 1st Fix Electrics

  • First fix electrical work is installed now to the pre-approved positions. Cabling will be installed for your lighting and sockets. The position of any switches and sockets will be approved with you prior to installation.
    • a. Existing Consumer Unit. It is assumed that the electrics will run off of your existing consumer unit.
    • b. New Mini Consumer. The option of upgrading your consumer unit can be explored prior to the work commencing or at time of works if found necessary.

21. Plaster boarding

The walls and ceilings will now be plaster boarded as necessary and in accordance with the approved set of plans and calculations.


22. Ceiling Alteration

The alteration to the existing upstairs ceiling now takes place to enable the stairs to be fitted. Canopies and sheets are used during this stage and any dust and inconvenience is kept to a minimum.


23. Plastering

The newly created rooms are now plastered ready for finishing


24. 2nd Fix Carpentry

Second fix carpentry work is now completed to the skirting’s, architraves and doors to match existing as closely as possible, unless otherwise requested. Room doors will have a latch with bath/shower rooms having a lockable handle or bolt to be approved with yourself prior to fitting.

  • a. Skirting.
  • b. Architraves.
  • c. Doors.

25. Tiling (If applicable)

The tiling of shower/bathrooms can now be completed. However this is not an item that is included as standard as there are many different schemes to choose from. We will be glad to price for this item if required.


26. 2nd Fix Plumbing

Final plumbing work is now carried out to the pre-approved positions which will include the following:

  • a. Radiators.
  • b. Shower/Bathrooms. Sanitary ware to shower/bathrooms if your project has this incorporated into it.
  • Please note: sanitary ware is to be purchased by yourselves as there are many choices available to you on the market. This allows you to tailor your Bathroom to your individual tastes.

27. Final Electrical Work

Final electrical work is now completed and tested which will include the following:

  • a. Smoke Detectors. The fitting of smoke detectors to all levels as required under the building regulations.
  • b. Fan. A fan is fitted to the shower/bathroom if your project has this incorporated into it.
  • c. Stair Lighting. Staircases will automatically be fitted with two-way lighting with a switch at the top and bottom of the new staircase.
  • d. Lighting.
  • e. Sockets.

28. Decoration

The decoration can now be completed. However this is not an item that is included as standard as there are many different schemes to choose from. We will be glad to price for this item if required.


29. Final Clean

The loft conversion, scaffold, guttering and exterior of windows will now be given a good clean ready for the scaffold and skip to be removed.


30. Final Inspection

The local authority inspector will be contacted to give his final approval that all works have been completed as per the approved set of plans and calculations. We will apply for a completion certificate from your local authority that will be supplied to you in due course.


31. Scaffold & Skip Removal

Once the work is finished, the scaffold and skip will then be removed. All areas will be left clean and tidy and all building materials will be removed ready for you to enjoy your new loft conversion.


CONSULTATION PROCESS

CONSULTATION PROCESS

READ ABOUT OUR CONSULTATION PROCESS

 

DESIGN PROCESS

DESIGN PROCESS

READ ABOUT OUR DESIGN PROCESS

 

Arrange a call back to book a free design visit

We can call you back anytime Monday – Friday 9-5pm at a time of your choice. Simply fill out the form below and tell us the date and time you would like us to call you back and we will get in touch.

×

[contact-form-7 id=”1226″ title=”Brochure”]

×

Arrange a Viewing

If you would like to arrange a viewing of any of out past loft conversions, please fill out the form below and we will call you to arrange a convenient date and time.