Regency Loft Conversions

Loft Conversions Preston

Design Process

Welcome

Congratulations – you’re on the way to a larger, improved and more characterful home. Now it’s time to turn your ideas into design drawings that can become reality.

1. Architect Visit

Our office will contact you to arrange a mutually convenient time for our Architect to carry out a structural survey and discuss any queries you may have at this stage, note at this stage a deposit will be required to administer building regulation and architects fees these are already included in the initial proposa


2. You Approve

Professional, architectural plans are put together and sent to you for your final approval. You have the final say on everything.


3. Building Control Approval

Once you’ve signed off your Design, we send it to a Structural Engineer who produces a structural drawing vital for your build. All drawings are then submitted by us for Building Consent.


4. 3D Design Service

Once your Architectural plans have been approved our 3D Designer will bring your ideas to life, so you can view your loft conversion from every angle before work commences. Whatever you need we’ll go the extra mile to make sure you’re happy with your loft conversion plans.

This will also come in handy when you decide the fixtures and fittings of your new loft conversions, everything will be planned out and chosen before the work commences, please note this will not affect later additions during construction of your loft conversion if needed.

As a Regency customer you have the option to match all of your home’s current fixtures and fittings such as: flooring, wall coverings, tile, siding, paints etc. You may also choose mouldings, windows, doors, appliances, and fixtures matched to your selections. If needed, our 3D software will “fill in” selections that have not been decided upon
with materials that complement your colours and styles.

Please view our 3d design example here >>


5. Customer Portal

We use specialist cloud-based software to manage your project – from estimate through to warranty. You will receive job reports at each, and every stage of your loft conversion as listed in the schedule of works section of the proposal, this will enable you to keep up to date with the progress of your loft conversion You can access a personalised customer portal to keep track of your project every step of the way. Ask us for more information.


6. Party Wall

Before work can commence on your build you must gain approval from any neighbours who share a party wall. It’s best to do this as soon as possible – Regency will refer you to trusted specialists if you wish.


7. Pre-Start Contact

Three to six weeks before construction commences our office will contact you to double-check all your choices and answer any questions concerning the build itself.


8. The Perfect En-Suite

If you’re adding a bathroom or en-suite to your new loft conversion, it’s great to choose well before your build starts, this will ensure your loft conversion will be built on time with no delays. We have a preferred supplier which we regularly use which offers a vast array of bathroom fixtures and fittings including tiles as well as wet-rooms and underfloor heating systems at very competitive prices.

This company is also used for there 100% customer focus and care.


9. Your build commences

When you’re ready we begin the building work, supplying you with a dedicated team and project manager. See our CONSTRUCTION PROCESS page.

Inspection of your work will be carried out by your local authority Building Inspector at set intervals as works progress to ensure that your project is carried out in accordance with the approved set of plans and calculations.

Commencement/Structural Inspection

Steelwork and main timber structure

  • Floors
  • Roofs
  • Dormers

Insulation Inspection

Insulation to all fabric elements of the loft

  • Floors
  • Walls
  • Roofs

Final Inspection

All works completed to a plastered finish, and 2nd fix completed with drainage, mechanical ventilation and heating systems operational.

Certification Required Upon Completion:

Part P – BS7671 Electrical Installation Certificate
Regulation B1 – Certificate confirming satisfactory Installation and

commissioning of automatic fire detection/alarm system certificate Commissioning of any Sprinkler/Suppression Systems (if applicable)

This ensures that we are building in accordance with every possible building regulation, and you are guaranteed quality.

A completion certificate will be issued by Building Control when the works are finished. This can be supplied to your lender if required or kept with your records in case of future re sale of your property.

The completion certificate proves that all work was carried out to the prevailing building and fire regulations at the time the work was completed and was inspected by a local authority Building Control inspector accordingly.

Please note that Building Control Inspection fees are not included in the quoted cost and are to be paid by you direct to Building Control. Regency Loft Conversions will submit all relevant paperwork to building control on your behalf. The inspection fees are normally paid to your local authority when the commencement notice is served for your project.


CONSULTATION PROCESS

CONSULTATION PROCESS

READ ABOUT OUR CONSULTATION PROCESS

 

CONSTRUCTION PROCESS

CONSTRUCTION PROCESS

READ ABOUT OUR CONSTRUCTION PROCESS

 

Arrange a call back to book a free design visit

We can call you back anytime Monday – Friday 9-5pm at a time of your choice. Simply fill out the form below and tell us the date and time you would like us to call you back and we will get in touch.

×

    Request a Brochure

    Your Name *

    What town/city are you in? *

    How did you find us? Google, Yell.com, Recommendation?

    Your Telephone *

    Your Email *

    Subject *

    Your Message *

    ×